{"id":1037,"date":"2025-12-23T17:15:44","date_gmt":"2025-12-23T16:15:44","guid":{"rendered":"https:\/\/fbprocedes.com\/?page_id=1037"},"modified":"2026-01-16T18:46:25","modified_gmt":"2026-01-16T17:46:25","slug":"curved-bar-screen","status":"publish","type":"page","link":"https:\/\/fbprocedes.com\/en\/applications\/remplacement-degrilleur-courbe\/","title":{"rendered":"Remplacement d’un d\u00e9grilleur courbe"},"content":{"rendered":"
Replacing a curved screen makes it possible to modernize existing installations, improve screening reliability, and reduce operational constraints while adapting to existing structures.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
We are regularly consulted for the replacement of curved bar screens. They are often complicated to replace for several reasons:<\/p>
\u00a0<\/p>
Nevertheless, we can often suggest an interesting alternative to the curved bar screen that facilitates its operation, as shown in the photos below.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\tExisting context: a broken-down curved bar screen installed in an elevated channel. The effluent arrives via discharge piping, and the screenings are discharged into a downstream chute. The operator must periodically pull the waste with a rake to drop it into the bin located at ground level.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\tOur solution: an SG400 type bar screen, oriented at 90\u00b0 relative to the effluent inlet, mounted against one of the channel walls. The effluent is channeled toward the side of the bar screen via a stainless steel deflector of our supply. The screenings are thus discharged into a bin placed at ground level.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\tBenefits for the operator:<\/p>
\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t400 mm wide automatic vertical bar screen for flow rates up to 120 m3\/h<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\tCustomised automatic vertical bar screen for flow rates up to 6000 m3\/h<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t