In the department of Isère, we recently equipped two assembly lifting bar screen/compacting stations. These are the 97th and 98th bar screens FB Processes installed in this department.
The first is installed very classically in a canal. The second is directly in the post, applied against the vertical wall.
These two types of installation are perfectly feasible on new or existing structures. The choice is often made based on the context or the level of operational comfort desired.
Our technology (upstream screening/downstream discharge) has the advantage of maintaining a «base» for optimal handling of waste: cleaning the screen from upstream.
Do not hesitate to contact us to ask for advice and to explain the intricacies of our «unique» technology.
Technical data
Provision of a ensemble bar screen/compactor on PR Golf
- Bar Screen of a type XG12, Installed in a canal
- ALL INOX 304L
- Width 1500mm
- Max flow rate 2110m3/h
- Interference 10mm
- Depth under laying plan 1900mm
Options selected
- Compacting type vise VCP250
- Automatic presser
- Safety pack
- Electric box «FB Processes» for joint management
- On-site transportation
Provision of a ensemble bar screen/compactor on PR Charmes
- Bar Screen of a type NG21, Installed in a ∅2500mm post
- ALL INOX 304L
- LARGUE 1000mm
- Max flow rate 860m3/h
- Interference 10mm
- Depth under laying plan 3900mm
- Manual emergency basket
Options selected
- Compacting type vise VCP250
- Automatic presser
- Safety pack
- Electric box «FB Processes» for overall management
- On-site transportation
Photos of the project



