One more Bar Screen in Isère (38)

06/06/2018
Bar Screen

We have just installed a new Bar Screen in Isère, bringing the total in this department to 82.

The Bar Screen is mounted against a vertical wall, facing the effluent inlet pipe. The screenings are discharged outside the chamber, directly into a waste bin.

Project features


  • Vertical NG21 Bar Screen
  • All stainless steel 304L
  • Bar spacing: 10 mm
  • Depth below mounting level: 2600 mm
  • Design flow: 180 m3/h
  • FB Procédés electrical control panel, mounted directly on one side of the Bar Screen
  • Installation carried out by an FB Procédés technician, including operator training
Bar Screen in a pumping station

 

Bar Screen in a pumping station

 

Bar Screen in a pumping station

 

 

Bar Screen in a pumping station