2 bar screens installed at 4-year intervals

21/02/2022
Degriller

We recently installed a vertical XG12 type bar screen automatic on a wastewater treatment plant, replacing a «staircase» bar screen type from a competing brand. The same operation had been carried out in 2017 on the parallel canal.

In addition to a good deal of handling inside the premises to install the various pieces of the second one bar screen, our technicians took advantage of this move to – at the request of the client – increase the gap between the first one’s grille bar screen from 15 to 6mm. To do this, they had to lower the upper chassis, replace the lower chassis, and finally replace the serrated plate.

This carefully planned intervention required two days of work by two technicians.

Technical data


Supply of a vertical bar screen automatic

  • Type XG12
  • ALL INOX 304L
  • Maximum flow to be treated 950m3/h
  • Interference 6mm
  • Width 1000mm
  • Depth under laying plan 1300mm
  • Discharge into existing transport screw

Options considered:

  • Standard electrical kit FB Procédés for the operation of both bar screens
  • Replacement of the lower chassis on the first one bar screen (gap reduced from 15 to 6mm)
  • Disassembly of competing equipment and assembly of the new equipment FB Procédés (twice, with an interval of 4 years) by our technicians
  • Training of the operating personnel carried out by our technicians

Photos of the project