2 bar screens of 15500mm under the installation plan in Luxembourg

19/12/2017

Earlier this month, we delivered and installed two XG12 type bar screens automatic systems at a wastewater treatment plant in Luxembourg. The main characteristic of this project is the depth under the installation plan, namely 15500mm. The time for the entire excavator/cart to complete a full cycle (down-cleaning of the grate-assembly and ejection of waste) is 3min and 50s.

Project characteristics


  • 2 Bar Screens vertical Type XG12
  • All stainless steel 316L
  • Interference: 50mm
  • Depth under laying plan: 15500mm
  • Width bar screen: 1200mm
  • Grille height: 6000mm
  • Flow to be treated: 20520m3/h per bar screen
  • Electrical equipment (motor, running gear and manual boxes compliant with ATEX standards)
  • Assembly carried out by two technicians FB Procédés
Bar Screen in a canal
Bar Screens upstream face
Bar Screen in a canal
Bar Screens face downstream
Bar Screens in a canal
View from the laying plan