08/10/2020

In recent days, we had two important projects to complete, involving the replacement of bar screens competing brands and, what's more, using different technology.

An exercise that is always delicate for several reasons:

– the quotation process carried out by our sales representatives must be mastered,

– our technical and financial offer must highlight all the advantages of our solution,

– our engineering office must identify the client’s needs and optimize operations,

– finally, our technicians must be quick and efficient before training the staff on our technology during commissioning.

After a few hours of operation, the comparisons and comments from the operators did not take long to come. The equipment is quieter due to the absence of washing chutes, but it is also much more compact. These are important advantages when they bar screens are located in a confined space. The water consumption is zero, since the PROSTEP bar screen type operates without the need for water supply. And finally, there is no need to worry about the tedious replacement of brushes and bristles.

Do not hesitate to contact us if you have similar needs.

The entire team FB Procédés is at your disposal.

Technical data


Case concerning the department of Ardèche

Replacement of 2 bar screens screws of a competing brand with 2 bar screens type screws PROSTEP

  • ALL INOX 316L
  • Maximum flow at bar screen 600m3/h
  • Interference 4mm
  • Channel depth 700mm
  • Channel width 700mm
  • 3 days of intervention
  • Options selected: waste chute for waste discharge, supply of a piston press with its adapter chute, disassembly of the existing system and installation of the new one by a technician FB Procédés, training of the operating staff.

Case in the Morbihan department

Replacement of bar screen a screw of a competing brand with a bar screen type PROSTEP

  • ALL INOX 304L
  • Max flow rate 190m3/h
  • Interference 6mm
  • Channel depth 1460mm
  • Channel width 700mm
  • 1 day of intervention
  • Options selectedMaintenance pole, waste evacuation chute, upstream/downstream «radar» probes, electrical cabinet FB Procédés, installation performed by a technician FB Procédés and training of the operating personnel.