Three bar screens FB Processes replaced

19/06/2023
Replacement of bar screens

Three bar screens FB Processes replaced

May was the month of replacements for the bar screens FB Processes. Two at the Rezé wastewater treatment plant (44), then three at pumping stations on the Rennes side (35), and finally three more at a storm water basin in Limoges (87).

It should be noted that all the bar screens automatic transmissions that were replaced had at least 15 years of service.

Of the three bar screens installed in Limoges, the width of each machine is 1400mm for a total height of 6000mm.

If you encounter problems with your Bar Screens If you have existing equipment, please do not hesitate to contact our sales team. The sales representative for your area will come to take the measurements on site, and then we will provide you with our best technical and financial proposal.

Technical data

Equipment:

  • Type of equipment: Bar Screens vertical type NG11
  • Flow rate: 4700 m3/h per bar screen
  • Material: Stainless steel 304L
  • Depth: 3100mm

Options considered:

  • Isolation screens above the grille
  • Standard FB electric kit Processes for the 3 bar screens
  • On-site transportation
  • Demolition of the existing structure & installation of the bar screens new structure by two FB Procédés technicians, assisted by Alexandre – our R&D engineer – with testing, adjustments and commissioning
  • Supply of a spare parts kit